Debates of March 4, 2010 (day 4)

Topics
Statements

QUESTION 47-16(5): NAHANNI BUTTE GYMNASIUM STRUCTURAL DEFICIENCIES

I would be remiss if I didn’t at least mention one of my most passionate items that I’ve raised in this House, which is the Nahanni Butte gymnasium. We had some deficiencies, we had a plan to address them, and I’d like to ask the Minister of Public Works and Services at what stage is the repairs of the Nahanni Butte gymnasium to the deficiencies. Thank you.

Speaker: MR. SPEAKER

Thank you, Mr. Menicoche. The honourable Minister responsible for Public Works and Services, Mr. Michael McLeod.

Thank you, Mr. Speaker. Mr. Speaker, this is an issue that has been of great concern to the community and to the Member. We have taken a number of measures to come up with a plan to rectify the situation where the moisture in the cement flooring has caused some swelling of the covering that was placed on the floor. We have now gone back into the community and have come up with a plan with the contractor. Several tests were done and it was found that some of the vents were closed to allow the slab to dry and get some of the moisture out of the floor. We have ordered most of the material, most of it’s on site, and as soon as the floor is ready, we will come up and have the contractor in the community to rectify the situation. Thank you.

Will the contractor do the same type of material replacement or is there an alternate solution to have a floor that adheres to the cement? Thank you.

Mr. Speaker, we had the contractor do an analysis. It was determined that there had to be a change in the methodology of applying the product that was going to be the finished surface. There has to be now a buffer in between it. There also has to be some allowance for airflow so that the system can be rid of the moisture that builds up. So it’s a different product completely from what we were initially trying to use for this flooring. Thank you.

What is the exact expected date of completion of the new floor, Mr. Speaker? Thank you very much.

Mr. Speaker, I’ve been assured by officials that we’ll have the floor in place as soon as possible. Thank you.

Speaker: MR. SPEAKER

Thank you, Mr. McLeod. Your final supplementary, Mr. Menicoche.

Thank you very much, Mr. Speaker. I’d like to ask the Minister if he can come with me to Nahanni Butte to look at the project and, hopefully, if he does find an appropriate date, that the floor is complete. Thank you very much.

I appreciate the invitation and certainly will commit to travel to the Member’s communities in the next little while. Thank you.

Speaker: MR. SPEAKER

Thank you, Mr. McLeod. The honourable Member for Sahtu, Mr. Yakeleya.