Written Question 28-19(2): Taltson Hydro Expansion Project
Mr. Speaker, my second set of questions are on the Taltson Hydroelectric Expansion Project. My questions are for the Minister of Infrastructure. The Executive's 2030 Energy Strategy and a Climate Change Strategic Framework rely heavily upon greenhouse gas reductions supposedly resulting from a major expansion of the Taltson hydroelectric system. Could the Minister describe the phases of the proposed Taltson hydroelectric expansion set out in the 2030 Energy Strategy, including the following:
Identify the time frames of construction, how each phase of construction will be financed, and to whom will the energy be sold;
Identify the amounts of power to be generated and whether any additional impoundment and/or flooding will occur;
State the GHG reductions anticipated for each of the phases and in which jurisdictions those reductions will take place; and
State the calculated costs for each phase, including a breakdown of hydro facilities, power lines, and related infrastructure, including roads and the engineering class for such cost estimates.
Mahsi, Mr. Speaker.